Project Name
150MW Solar Project - Ludbay
Project Capacity
207 MW
Location
Ludbay-Dhoro (Nakhtrana) Kutch, Gujarat
Area
3,350,800 sqm
Annual Unit Generation:
The Ludbay solar installation produces approximately 362.7 million units (kWh) annually, driven by strong solar exposure and optimized plant design. The consistent generation supports grid stability, lowers dependency on conventional power sources, and contributes to long-term operational energy reliability.
Carbon Emission & Environment:
This project offsets nearly 263,657 tCO₂ each year (~2.64 lakh tons), marking a substantial reduction in carbon output. The environmental impact extends beyond emissions, supporting cleaner air, responsible energy use, and alignment with national climate commitments.
Energy Efficiency & Sustainability Impacts:
Designed for large-scale performance, the Ludbay project strengthens clean energy adoption through efficient infrastructure and high-output generation. It enhances energy security, promotes responsible land utilization, and supports India’s transition toward sustainable, renewable power ecosystems.
Glimpses of Solar Power Plant of Ludbay